20th February 2011 Draining the quagmired lane below the school.

Work was needed on the lane below the school. As we had more rain so the lane became muddier. We dug channels and they started draining well. There are 4 natural springs , this one was running like a fully opened tap.


 More channels  busy draining the area


The "path" below the school! The bridge has been temporarily disassembled to dig a ditch underneath it.



The channel flowing well under the "bridge"