Work was needed on the lane below the school. As we had more rain so the lane became muddier. We dug channels and they started draining well. There are 4 natural springs , this one was running like a fully opened tap.
More channels busy draining the area
The "path" below the school! The bridge has been temporarily disassembled to dig a ditch underneath it.
The channel flowing well under the "bridge"
Looks much better!
ReplyDelete