January 2011
Peter Hammond volunteered to fix the leaking dam wall
A coffer-dam was built from rocks
Clay soil was stamped down making it watertight
The hole was cleaned out
15 wheelbarrows of cement were mixed
It was packed into the hole, and along the whole bottom area of the wall
Finished! Within three days the water had covered the coffer-dam and the dam filling up.
Great job!!
No comments:
Post a Comment