Monday, May 21, 2018

May 2018

May 2018

Tap upgrade






Jeanne and Grant Mortimer offered to  do a makeover at the
 tap near the bathrooms. A huge improvement!


***********************************************************************************************************************************

Bridge Renovations


 The small bridge  in the lane by the school was blocked—it needed a bigger pipe.
There was one in the bush, so Wilson and Shepherd rolled it to the site.


 The small pipes were removed , the big one put in its place


Stones were placed at the sides to strengthen it.


All fixed!

***********************************************************************************************************************************

New fencing at top parking




New corral fencing  on the East side






Top parking  


We were given more two more lots of paving bricks so now the parking  is paved to the big gum tree.

 Looks a bit like mosaic but it does the job.


 The gardens being weeded






Coral fencing being erected on one side on the parking opposite the playground

***********************************************************************************************************************************

Poplar firewood




At last the big poplar  that fell down about a year ago, 
is being  cut up  and removed by Manuel for firewood

********************************************************************************************************************************

Top Dam cleanup


John Barrow kindly loaned Delta  Park a TLB for 4 days
I had it for 1 day and Jozi trails had it for 3 days.



Moses removed the floating island of papyrus and the tall blue plants.



 It was wonderful seeing huge loads of that island being swept up and out the dam



- now the dam is beautifully clear.