May 2018
Tap upgrade
Jeanne and Grant Mortimer offered to do a makeover at the
tap near the bathrooms. A huge improvement!
***********************************************************************************************************************************
Bridge Renovations
The small bridge in the lane by the school was blocked—it needed a bigger pipe.
There was one in the bush, so Wilson and Shepherd rolled it to the site.
The small pipes were removed , the big one put in its place
Stones were placed at the sides to strengthen it.
All fixed!
***********************************************************************************************************************************
New fencing at top parking
New corral fencing on the East side
Top parking
We were given more two more lots of paving bricks so now the parking is paved to the big gum tree.
Looks a bit like mosaic but it does the job.
The gardens being weeded
Coral fencing being erected on one side on the parking opposite the playground
***********************************************************************************************************************************
At last the big poplar that fell down about a year ago,
is being cut up and removed by Manuel for firewood
********************************************************************************************************************************