AUGUST 2011
Top Dam
The island of papyrus was blocking the outlet at the spillway
John Barrow of Barrow Constructions generously loaned us a TLB for the day.
Moses, the driver, dragged the island slowly to the edge
A huge heap of papyrus being pushed up the bank
The last little bit!!
The spillway is clear again
The papyrus on the bank where it will dry
Our lovely dam!!